¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡CURRICULUM VITAE
PERSONAL
NAME£º Wang Jun Bao
SEX£º Male
RACE£º Han Chinese
DATE OF BIRTH£º Jun 24, 1961
HEATH£º Well
GRADUATED FROM£º China Construction Bureau Middle Specialty School
MAJORING£º Civil Management of Industrial Construction
¡¡¡¡¡¡¡¡¡¡ Project Manager Certification
¡¡¡¡¡¡¡¡¡¡ Budgeteer Certification
WORK EXPERIENCE£º
¡î 1982~1995 Worked for China Construction No.6 Bureau
¡ò 1982~1984 Worked in Contract and Budget Department.
¡ò 1985~1995 Participated in the following projects:
| 1. Workshop Expansion Project of Tianjin Steel Co. as foreman. |
|
|
| 2. Tianjin Alpha Feed Co. as foreman. |
|
|
| 3. Workship Expansion Project of Tianjin Ink Co. as foreman |
|
|
| 4. Tianjin Yangliuqing Chicken Co. as project manager. |
|
|
| 5. Accommodation Building Project of Tianjin Consulting Bureau. as project manager. |
|
|
¡î 1996~2000 Worked for Tianjin Plenty International Construction Co.,Ltd first as project manager then Vice General Manager, responsibilities including project management, construction budgeting and site construction management, and had participated in the following projects:
1. Boxi Subsea Pipeline Shore Approach Sea bank, pre-trenching, welding and post-trenching.
2. Boxi Pipeline Shore Approach Installation
3. Boxi Terminal Pipeline Installation
4. SZ36-1 Stage 2 Shore Approach Pipeline Pulling and backing.
5. SZ36-1 Stage 2 Shore Approach Blasting and trenching.
6. Ship repairing.
7. SZ36-1 Stage 2 Pipeline welding and backfilling.
¡î 2000~present As General Manager of Tianjin Tanggu Offshore Shipping Engineering Services Co., Ltd have participated in the following project:
1. Offshore Steels Transportation From Tanggu to Dalian Harbor.
2. Fabrication of reinforced concrete for Tianjin Economic Zone.
3. Heat Transformer Repairing for North Drilling Co.
4. Fabrication and transportation of concrete matrix for SZ36-1 Stage 2 Project and SZ32-6 Project.
5. Fabrication, transportation and installation of carport for SZ36-1 Oil Segregator Co.
6. Subsea Pipeline machining for QHD32-6 and SZ36-1 Stage 2 Project.
7. Offshore Topside Legs transportation of QHD32-6 Project.
8. Fabrication and transportation of flanges and riser clamps for SZ36-1 pipeline project and QHD32-6 project.
9. Well Repair Machine Offshore Transportation for QK18-1 Project.
10. Ship repairing for Sheng Baowang Shipyard.
11. Jacket lifting, pile driving, topside position shifting and lifting for Shengli Oil Field.
12. Offshore transportation of subsea pipeline, equipment and tools.
13. 2002/03~2002/08 Design and fabrication of subsea power cable laying equipment.
14. 2002/08~2002/09 Power cable laying of PL19-3 Project and SZ36-1 Project.
15. 2002/09~2002/11 Post Trenching of Pinghu Pipeline Project.
16. 2002/11~2002/12 Design and fabrication of Pile Oil Suction Equipment.
17. 2003/02~2003/07 Offshore Pile Oil Suction of Donghai Bridge
18£®2003/06~2003/07 Pinghu Pipeline Post-trenching Stage 3.
19. 2003/03~2003/12 Offshore Transportation of Donghai Bridge
20. 2003/03~2003/12 Offshore Transportation for COOEC.
21. 2003/09~2003/12 Bonan Subsea Pipeline Post-trenching.
22. 2003/09~2003/12 WZ12-1 Subsea Pipeline Post-trenching.
23. 2003/12~2004/01 Hangzhou Bay Submarine Pipeline Post-trenching.
24. 2004/05 CFD1-1 Submarine Pipeline Post-trenching.
25. 2004/06 BZ25-1 Submarine Pipeline Post-trenching.
26. 2004/06~2004/08 Fabrication of Caterpillar Pipeline Supports for BH109 and BH105.
27. 2004/07 Luda Submarine Pipeline Post-trenching.
|